General Process Flow l Power Plant : Regulating Dam - Siguragura Power Plant -
Tangga Power Plant l Transmission Lines l
Smelting Plant : Carbon Plant - Reduction Plant - Cast House
Tangga Power Plant l Transmission Lines l
Smelting Plant : Carbon Plant - Reduction Plant - Cast House
The power produced by 2 (two) power plants of PT Inalum is then transmitted to the Aluminium Smelter in Kuala Tanjung through 271 units of 275 KV Transmission Lines, 120 km long.
Through Inalum substation in Kuala Tanjung, the power is then distributed to three reduction buildings and other facilities through 2 units of Silicon Rectifier of DC 37 KV and 800 V.